The Sugar Engineers

Pan Steam Demand

Adapted from P.Honig, Principles of Sugar Technology Vol.2 - Ch.11 - Table 5 - second test (equated to 120 min cycle)

REFINERY PAN STEAM DEMAND DURING CYCLE
Strike Volume 2000 ft3 with stirrer 56.6 m3
Heating Surface 2491 ft2 231.4 m2
HS/vol: 1.24 ft2 4.09 m2
Steam 5.0 psi g 1.34 bar abs
Pan Steam Demand